Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
*
JNC TN9440 2000-005, 164 Pages, 2000/06
This report summarizes the operating and irradiation data of the experimental reactor "JOYO" 34th cycle, and estimates the 35th cycle irradiation condition. Irradiation tests in the 34th cycle are as follows: (1)C-type irradiation rig (C4F) (a)High burnup perfomance test of advanced austenitic stainless steel cladding fuel pins (in collaboration with France) (2)C-type irradiation rig (C6D) (a)Large diameter fuel pins irradiation tests (3)Absorber Materials Irradiation Rig (AMIR-6) (a)Run to absorber pin's cladding breach (4)Core Materials Irradiation Rig (CMIR-5) (a)Cladding tube materials irradiation tests for "MONJU" (5)Structure Materials Irradiation Rigs (SMIR) (a)Decision of material design base standard of structure materials for prototype reactor and large reactor (6)Upper core structure irradiation Plug Rig (UPR-1-5) (a)Upper core neutron spectrum effect and accelerated irradiation effect (7)SurVeillance un-instrument Irradiation Rig (SVIR) (a)Confirmation of surveillance irradiation condition for "JOYO" (b)Material irradiation tests (in collaboration with universities) The maximum burnup driver assembly "PFD537" reached 68,500MWd/t(pin average).